
Services
Tennis Court Construction & Resurfacing
From a single backyard court to multi-court club complexes, we build hard courts that drain fast, play true, and last for decades. Our crews handle everything from excavation and base work to color coating and net posts.
What's Included
Our tennis courts services
New Construction
Laser-graded stone base, post-tension or asphalt slab, and 100% acrylic color systems engineered for New England freeze-thaw cycles.
Resurfacing
Crack repair, leveling, and fresh acrylic coatings that restore grip, color, and line accuracy to tired courts.
Conversions
Add pickleball lines, reconfigure for multi-sport play, or convert clay to hard court and back.
Our Process
How we get it done right
A proven sequence that protects your investment from the base up.
- 1
Site evaluation and drainage assessment
- 2
Excavation, grading, and base installation
- 3
Asphalt or post-tension concrete slab
- 4
Acrylic color coating and line striping
- 5
Net posts, nets, and accessory install
FAQ
Common questions
- How long does a new tennis court take to build?
- A typical single court takes 4–8 weeks depending on site conditions and weather, including required curing time between phases.
- How often should a court be resurfaced?
- Most hard courts benefit from resurfacing every 4–7 years to maintain playability and protect the underlying surface.
Explore other services
Planning a tennis courts project?
Tell us about your court or track project and we will put together a free, no-obligation estimate.